Section 1 – Introduction:  Section 1 Introduction   |    Metropolitan’s Main Supply Lines   |     Cadiz Project Alternatives   Â
Section 2 – Assessment of Project Need and Purpose: Assessment of Project Need and Purpose   |     Metropolitan’s Service Area   |     Metropolitan Member Agencies   |      Major Groundwater Basins Within Metropolitan’s Service Area  Â
Section 3 -Formulation of Screening Potential Projects and Site-Specific Alternatives: Formulation and Screening of Potential Projects and Site-Specific Alternatives   |    Additional Conveyance Alignment Considered   |    Screening – Level Water Conveyance Alignments   |     Proposed Wellfield and Manifold System   |     Generalized Location of the Cadiz Project Facilities   |    Bristol, Cadiz, Fenner, and Orange Blossom Wash Watershed
Section 4 – Description of the Project AlternativesÂ
Section 5 – Affected Environment, Impacts and Mitigation
Section 6 – Growth Inducement Impacts
Section 7 – Cumulative Impacts
Section 8 – Unavoidable Significant Adverse Impacts
Section 9 – Short Term Versus Long Term Productivity Impacts
Section 10 – Irreversible and Irretrievable Commitment of Resources
Section 11 – Selection of the Environmentally Preferred Project Alternative: Relative Ranking of Alternatives   |    Selection of the Environmentally Preferred Project Alternative
Section 12 – Public Involvement and Agencies and Persons Consulted
Section 13 – Permits Required for the Cadiz Project
Section 14 – List of Preparers
Section 16 – Glossary of Terms, Acronyms and Units of Measurement
Volume 1 Appendices
Appendix A — California Desert Plan Amendment Process A-1
Appendix B — Traffic Analysis Tables B-1
Appendix C — Air Quality Analysis Tables C-1
Attachment C1 — Construction Emission Factors
Attachment C2 — Construction Emissions for the Eastern Alternative
Attachment C3 — Construction Emissions for the Western Alternative
Attachment C4 — Construction Emissions for the Combination Alternative
Attachment C5 — Construction Emissions for the Eastern/Canal Alternative
Attachment C6 — Operational Emission Factors and Emissions
Appendix D — Findings and Determinations for Historic Properties D-1
Appendix E — Correspondence Regarding Clean Water Act Section 404 E-1.xi
