This study evaluated the effectiveness of two bioswales eight years after construction in Davis, California. An identically sized control bioswale consisting of non-disturbed native soil was located adjacent to the treatment bioswale. Surface runoff quantity and quality were measured during three experiments with different pollutant loads.