Laguna Conceptual Restoration Design

Laguna Conceptual Restoration Design
Lower Colorado River
Task 3 – Final/Preferred Concept and Detailed Cost to
the MSCP Planning Team

Presentation Outline

• Purpose and Objectives (Allen Haden – NCD)

• Site Map

• Project Design Considerations and Alternative Analysis

• Alternative 1 Overview

• Channel Design & Construction

• Water Delivery & Water Control Structures (John Wesnitzer – SWI)

• Re-vegetation and Habitat (Fred Phillips – FPC)

• Water Operations and Management (George Cathey – NCD)

• Cost Summary

• Additional Information Needs

• Timeline for Project Development (Bill Singleton – USBR) […]

Download the full presentation here